A look inside the new factory where Metro train cars are being built
Hitachi Rail’s sleek $100 million plant broke ground in 2022 and opened this week. Local assembly was a requirement of the Metro contract, currently at $700 million with a possible total of $2.2 billion. Trains for the Baltimore and Philadelphia systems are also being built at the plant. It’s about...
Redirecting to full article...